Practical Engineering was recommended to InterOil Corporation for the re-design of a heli-portable drill floor. The drill floor required a larger rotary table, increased deck space and the entire rig was raised two metres. Practical Engineering worked closely with InterOil Corporation to adhere to strict weight restrictions enabling the rig to be airlifted by helicopter into its position in the Papua New Guinean highlands.
Practical Engineers designed:
- Pony bases for the rig carrier
- A structurally efficient drill floor
- BOP Handling system
- Modular access system – a heli-transportable stair towers
- A structural frame to extend the height of the dog box
- Ancillary equipment affected by the change in rig height
In this time critical project, Practical Engineering delivered on-time and on-budget. |